Session of 2026
HOUSE BILL No. 2636
By Committee on Energy, Utilities and Telecommunications
Requested by Allie Devine on behalf of Kansas Farm Bureau and Kansas Livestock Association
2-2
1AN ACT concerning energy; relating to certain electric generation and
2energy storage facilities; establishing requirements for the
3development, construction, modification, operation, maintenance and
4decommissioning of industrial wind and solar energy conversion
5systems and industrial battery energy storage systems; authorizing the
6board of county commissioners of a county to permit or deny the
7construction of such industrial energy facilities; establishing a protest
8petition and election process to contest such county action; providing
9jurisdiction to the state corporation commission to control and permit
10the development, construction, modification, operation, maintenance
11and decommissioning of such facilities; requiring the commission to
12approve and issue a permit prior to the new construction or expansion
13of any such facility; requiring owners of existing industrial energy
14facilities to register with the commission; establishing minimum
15setback distances for such facilities; requiring the commission to adopt
16a code of conduct and agricultural mitigation protocols; requiring a
17facility owner to establish and maintain a decommission plan and
18provide adequate financial assurance for the decommissioning;
19authorizing the commission to issue certain orders and impose civil
20penalties for violations; authorizing the commission to adopt rules and
21regulations.
22
23Be it enacted by the Legislature of the State of Kansas:
24Section 1. The legislature hereby finds and declares that:
25(a) The development of industrial energy facilities in Kansas
26significantly affects the welfare of the population, the environmental
27quality, the aesthetic quality, the location and growth of agricultural,
28industrial and commercial activities and the use of the state's natural
29resources;
30(b) the development of industrial energy facilities within the state
31should be regulated to promote the reasonable, orderly and effective
32development of such facilities; and
33(c) the development, construction, modification, maintenance,
34operation and decommissioning of industrial energy facilities are matters
1of both statewide and local concern and interest.
2Sec. 2. As used in sections 1 through 13, and amendments thereto:
3(a) "Cessation of operations" means an industrial energy facility or
4generating or storage unit thereof has not produced or discharged electrical
5energy for a period of 12 months, except that such 12-month period shall
6not include any period in which the: (1) Project fails to produce or
7discharge electrical energy due to an event of force majeure; or (2) owner
8of the industrial energy facility has retained legal control of the project's
9footprint and has commenced rebuilding the facility.
10(b) "Commission" means the state corporation commission.
11(c) "Expansion" means any:
12(1) New addition to an existing industrial energy facility that
13increases the site area or physical footprint of such facility or, in the case
14of an industrial wind energy conversion system:
15(A) Construction of a new wind turbine; or
16(B) activity that increases to the total tower height of a wind turbine
17as measured from ground level to the blade tip; or
18(2) repowering of an existing industrial energy facility.
19(d) "Full and complete decommissioning" means, commencing upon
20the cessation of operations of an industrial energy facility:
21(1) The removal and proper disposal of all generating units or energy
22storage units and all appurtenant facilities and equipment of the industrial
23energy facility, including, but not limited to, the foundations, support
24structures, electric lines, electric and electronic devices, energy storage
25facilities and fencing; and
26(2) the return and restoration of any land disturbed or changed as a
27result of the construction and operation of the industrial energy facility to
28the useful condition that existed prior to the construction and operation of
29the facility.
30(e) "Industrial battery energy storage system" means an
31electrochemical or thermal device or system of devices that are capable of
32absorbing and storing electrical or thermal energy and discharging such
33energy at a later time to provide for the discharge or production of one
34megawatt-hour or more of electrical energy. "Industrial battery energy
35storage system" includes any appurtenant facilities and equipment of an
36industrial battery energy storage system.
37(f) "Industrial energy facility" means any:
38(1) Industrial battery energy storage system;
39(2) industrial solar energy conversion system; or
40(3) industrial wind energy conversion system.
41(g) "Industrial energy facility owner" means any person or entity that:
42(1) Has a direct ownership interest in an industrial energy facility
43regardless of whether the person or entity is involved in acquiring the
1necessary rights, permits and approvals or planning for the construction
2and operation of the facility; or
3(2) is acting as the developer or operator of an industrial energy
4facility by acquiring the necessary rights, permits and approvals or
5planning for the construction and operation of the facility, regardless of
6whether the person or entity will directly own or operate the facility.
7(h) "Industrial solar energy conversion system" means any device or
8assembly of devices and supporting facilities that are used to convert
9sunlight into electrical energy for the primary purpose of storage and
10wholesale sales of generated electricity and has a total system-rated or
11nameplate generating capacity of one megawatt or more. "Industrial solar
12energy conversion system" includes any appurtenant facilities and
13equipment of an industrial solar energy conversion system.
14(i) "Industrial wind energy conversion system" means any device or
15assembly of devices and supporting facilities that utilize wind energy to
16generate electricity for the primary purpose of storage and wholesale sales
17of generated electricity and has a total system-rated or nameplate
18generating capacity of one megawatt or more. "Industrial wind energy
19conversion system" includes any appurtenant facilities and equipment of
20an industrial wind energy conversion system.
21(j) "Nonparticipating property" means any parcel of real property that
22is adjacent to a parcel of real property for which a landowner has entered
23into a lease or easement agreement to authorize the construction and
24operation of an industrial energy facility on such property, and the
25landowner of such nonparticipating property has not entered into any such
26lease or easement agreement relating to such facility.
27(k) "Partial decommissioning" means, commencing upon the
28cessation of operations of an individual generating unit or energy storage
29unit of an industrial energy facility:
30(1) The removal and proper disposal of all generating units or energy
31storage units and all appurtenant facilities and equipment of the industrial
32energy facility, including, but not limited to, the foundations, support
33structures, electric lines, electric and electronic devices, energy storage
34facilities and fencing; and
35(2) the return and restoration of any land disturbed or changed as a
36result of the construction and operation of the industrial energy facility to
37the useful condition that existed prior to the construction and operation of
38the facility.
39(l) "Repowering" means any construction activities to completely or
40partially dismantle, upgrade and replace equipment at an industrial energy
41facility that results in an increase to the facility's energy generation output
42or energy storage potential. "Repowering" does not include routine
43maintenance or replacement of malfunctioning equipment or components.
1Sec. 3. (a) On and after July 1, 2026, the board of county
2commissioners, by resolution, may permit or deny the construction of an
3industrial energy facility within the county. Such resolution shall be
4published once each week for two consecutive weeks in a newspaper of
5general circulation in the county. The resolution shall take effect 60 days
6after final publication unless a valid protest petition, signed by not less
7than 5% of the qualified electors of the county, is filed with the county
8election officer within 60 days of the final publication of the resolution.
9(b) Notwithstanding the provisions of subsection (a), the qualified
10electors of a county may file a petition to the board of county
11commissioners of a county requesting an election to permit or deny the
12construction of an industrial energy facility within the county. Such
13petition shall be signed by not less than 5% of the qualified electors of the
14county.
15(c) The following statement shall appear on a petition filed pursuant
16to subsection (a) or (b):
17"We request an election to determine whether an industrial energy
18facility owner shall be allowed, either directly or indirectly, to own,
19acquire or otherwise obtain or lease any agricultural or other land for the
20purpose of constructing an industrial energy facility in _______ county."
21(d) If a valid petition is filed pursuant to subsection (a) or (b), the
22county election officer shall submit the following question to the qualified
23electors of the county at the next state, county or special election:
24"Shall an industrial energy facility owner be allowed, either directly or
25indirectly, to own, acquire or otherwise obtain or lease any agricultural or
26other land for the purpose of constructing an industrial energy facility in
27________ county?"
28(e) If a majority of the votes cast and counted are in opposition to
29allowing an industrial energy facility to be constructed in such county, an
30industrial energy facility shall not be constructed in such county. The
31county election officer shall transmit a copy of the result of such election
32to the secretary of state, who shall publish such result in the Kansas
33register with a statement that an industrial energy facility shall not be
34constructed in such county.
35(f) If a majority of the votes cast and counted are in favor of allowing
36an industrial energy facility to be constructed in such county, an industrial
37energy facility may be constructed in such county subject to all federal and
38state laws and rules and regulations, local ordinances or resolutions,
39enforceable land use restrictions and the terms or conditions of any
40agreement that pertains to an industrial energy facility. The county election
41officer shall transmit a copy of the result of such election to the secretary
42of state, who shall publish such result in the Kansas register with a
43statement that an industrial energy facility may be constructed in such
1county.
2(g) The election provided for by this section shall be conducted, and
3the votes counted and canvassed, in the manner provided by law for
4question submitted elections of the county.
5(h) No election conducted pursuant to this section shall be applied or
6construed to prohibit the development, construction, modification,
7operation, maintenance or decommissioning of any industrial energy
8facility that was:
9(1) Constructed on or before July 1, 2026; or
10(2) authorized to be constructed by the board of county
11commissioners prior to July 1, 2026, through:
12(A) The issuance of a building, zoning or development permit that
13authorizes the construction of the facility pursuant to zoning regulations;
14(B) the issuance of a conditional or special use permit that authorizes
15the construction of the facility notwithstanding zoning regulations; or
16(C) the execution of a contractual agreement between the county and
17the industrial energy facility owner that establishes terms, conditions,
18rights and remedies relating to the development and construction of such
19industrial energy facility within the county.
20Sec. 4. (a) Except as otherwise provided in this section, the state
21corporation commission is given full power, authority and jurisdiction to
22supervise and control the development, construction, modification,
23operation, maintenance and decommissioning of industrial energy facilities
24in this state. The commission shall have continuing jurisdiction over the
25development, construction, operation, maintenance and decommissioning
26of any industrial energy facility permitted by the commission pursuant to
27section 5, and amendments thereto.
28(b) Nothing in this act shall preempt or prohibit:
29(1) Any county or city from adopting or implementing planning and
30land use laws, ordinances, resolutions and regulations pursuant to K.S.A.
3112-741 et seq., and amendments thereto, that are more restrictive than the
32provisions of this act, or any rules and regulations adopted thereunder, for
33the protection of public health, safety and welfare;
34(2) any county or city from requiring an industrial energy facility
35owner to enter into a separate agreement with such county or city that
36imposes terms and conditions that are more restrictive than the provisions
37of this act, or any rules and regulations adopted thereunder, for the
38protection of public health, safety and welfare; or
39(3) the enforceability and operation of any terms and conditions of
40any written lease or easement agreement between a landowner and an
41industrial energy facility owner that are more restrictive than the
42provisions of this act, or any rules and regulations adopted thereunder.
43Sec. 5. (a) On and after July 1, 2026, no person or entity shall,
1without first obtaining a permit from the commission in accordance with
2this section, begin site preparation for or construction of a new industrial
3energy facility or proceed with an expansion to an existing industrial
4energy facility. Whenever any person or entity seeks to obtain such a
5permit, the person or entity shall file an application with the commission
6that provides:
7(1) The name, address and contact information of the applicant;
8(2) a description of the nature, purpose and location of the facility or
9expansion thereof;
10(3) a statement of the reasons for the selection of the proposed
11location of the facility or expansion thereof;
12(4) the estimated date that construction will commence and the
13estimated duration of construction;
14(5) a site plan of the proposed industrial energy facility or expansion
15thereof;
16(6) the names and addresses of the landowners of record whose land
17or interest therein is proposed to be acquired for the industrial energy
18facility or expansion thereof;
19(7) a narrative including how any noise, soil erosion, dust, water
20quality, safety issues and fire risks will be addressed by the applicant;
21(8) a description of the proposed decommissioning plan for the
22facility, which shall comply with the provisions of section 10, and
23amendments thereto; and
24(9) any other information as may be required by the commission.
25(b) An applicant shall have the burden of proof to establish by a
26preponderance of evidence that the development, construction,
27modification, operation, maintenance and decommissioning of the
28proposed facility will:
29(1) Comply with all applicable laws and rules and regulations and
30orders of the commission;
31(2) comply with the minimum setback distances established pursuant
32to section 8, and amendments thereto, or any more restrictive setback
33distances imposed pursuant to any local planning and land use laws,
34ordinances, regulations or agreements that establish more restrictive
35setback distances relating to such facility;
36(3) comply with the code of conduct and agricultural mitigation
37protocols established pursuant to section 9, and amendments thereto;
38(4) comply with the decommissioning requirements established
39pursuant to section 10, and amendments thereto, or any more restrictive
40decommissioning requirements established by the commission;
41(5) not pose a threat of serious injury to the environment or to the
42social and economic condition of any person who resides within or near
43the proposed location of the facility;
1(6) not substantially impair the health, safety or welfare of
2inhabitants; and
3(7) not be located in a county that prohibits the construction of an
4industrial energy facility pursuant to section 3, and amendments thereto.
5(c) Prior to filing a permit application pursuant to this section, a
6prospective applicant shall file with the commission a notification of intent
7to file such application not less than 60 days prior to filing such
8application.
9(d) Upon the filing of a permit application, the commission shall hold
10a public hearing on such application, which shall not be more than 90 days
11after the date that the application was filed, to determine whether the
12application and the proposed activities that will be conducted by the
13applicant comply with the requirements of this act and any rules and
14regulations adopted thereunder. The commission shall hold the public
15hearing in the county where the industrial energy facility or a majority of
16the industrial energy facility is proposed to be located.
17(e) (1) The commission shall publish a notice of the time, place and
18subject matter of the public hearing as follows:
19(A) On the commission's website, for not less than the 30 days prior
20to the public hearing; and
21(B) in a newspaper of general circulation in the county where the
22industrial energy facility is proposed to be located, once each week for two
23consecutive weeks, the last publication of which shall not be less than five
24days before the public hearing.
25(2) The commission shall provide written notice by certified mail of
26the public hearing to all landowners described in subsection (a)(6). Such
27written notice shall be postmarked not later than 20 days prior to the
28hearing date.
29(f) The commission shall conduct an evidentiary hearing on a permit
30application filed pursuant to this section at such time and place as the
31commission deems appropriate. All such hearings shall be in accordance
32with the provisions of the Kansas administrative procedure act and
33completed within 30 days after the commencement thereof.
34(g) The commission shall establish a permit application fee that is
35sufficient to compensate the commission for the actual cost of providing
36the notices required by this section and to investigate, review, hear and
37process the application. The commission shall remit all moneys received
38by the commission pursuant to this section to the state treasurer in
39accordance with the provisions of K.S.A. 75-4215, and amendments
40thereto. Upon receipt of each such remittance, the state treasurer shall
41deposit the entire amount in the state treasury and credit such amount to
42the public service regulation fund.
43(h) The commission shall issue a final order upon a permit
1application and render a decision with respect to whether the application
2and the proposed activities that will be conducted by the applicant will
3comply with the requirements of this act and any rules and regulations
4adopted thereunder compliance with the location of the proposed industrial
5energy facility. In addition to legal compliance, the commission may
6consider the impacts and benefits to Kansas residents, the affected county
7or counties, energy consumers in Kansas, energy consumers in other states
8and economic development.
9(i) The commission shall have authority to:
10(1) Order and enforce any additional or more restrictive terms and
11conditions as the commission may deem just and reasonable to best protect
12the rights of any interested party or those of the local inhabitants or general
13public. Such additional or more restrictive terms and conditions may relate
14to the development, construction, modification, operation, maintenance or
15decommissioning of the industrial energy facility; and
16(2) verify compliance with and enforce global or nationally
17recognized standards and technical specifications for the development,
18construction, modification, operation, maintenance or decommissioning of
19an industrial energy facility.
20(j) The commission shall issue a final order on the permit application
21within 180 days after the date that the application was filed.
22(k) (1) An initial permit shall not be required for any industrial energy
23facility that was:
24(A) Constructed on or before July 1, 2026; or
25(B) authorized to be constructed by a board of county commissioners
26prior to July 1, 2026, through:
27(i) The issuance of a building, zoning or development permit that
28authorizes the construction of the facility pursuant to zoning regulations;
29(ii) the issuance of a conditional or special use permit that authorizes
30the construction of the facility notwithstanding zoning regulations; or
31(iii) the execution of a contractual agreement between the county and
32the industrial energy facility owner that establishes terms, conditions,
33rights and remedies relating to the development and construction of such
34industrial energy facility within the county.
35(2) A permit shall be required for any industrial energy facility
36specified in this subsection prior to any site preparation for or construction
37of any new expansion of any such industrial energy facility.
38(l) Any permit application, documents submitted to the commission
39in relation thereto and orders of the commission relating to such permit
40shall be a public record and disclosed upon request.
41Sec. 6. (a) Any industrial energy facility owner of an industrial energy
42facility that is not required to obtain an initial permit pursuant to section
435(k), and amendments thereto, shall register such facility with the
1commission by filing an initial facility registration statement to the
2commission. Such initial facility registration statement shall be filed on or
3before December 31, 2026, and include the following:
4(1) The name, address and contact information of the registrant;
5(2) a description of the nature, purpose and location of the facility;
6(3) the current site layout and detailed footprint of the industrial
7energy facility;
8(4) the names and addresses of the landowners of record whose land
9or interest therein has been acquired for the industrial energy facility;
10(5) a description of the decommissioning plan that is established for
11such facility pursuant to section 10, and amendments thereto; and
12(6) any other information as may be required by the commission.
13(b) The commission shall require an industrial energy facility owner
14to file an updated and current facility registration statement not less than
15once every five years following the issuance of any permit pursuant to
16section 5, and amendments thereto, or the filing of an initial registration
17statement pursuant to subsection (a). Such updated and current facility
18registration statement shall include the following information:
19(1) The name, address and contact information of the registrant;
20(2) a description of the nature, purpose and location of the facility;
21(3) the current site area and detailed footprint of the industrial energy
22facility;
23(4) the names and addresses of the landowners of record whose land
24or interest therein has been acquired for the industrial energy facility;
25(5) written assurance that the site area and footprint of the industrial
26energy facility has not been modified from the site area or footprint that
27was last approved by the commission pursuant to any permit issued for the
28facility pursuant to section 5, and amendments thereto, or shown on the
29facility registration statement provided to the commission pursuant to this
30section;
31(6) a description of the decommissioning plan that is established for
32such facility pursuant to section 10, and amendments thereto; and
33(7) any other information as may be required by the commission.
34(c) The commission shall establish a facility registration statement fee
35that is sufficient to compensate the commission for the actual cost to
36investigate, review and process the facility registration statement. The
37commission shall remit all moneys received by the commission pursuant
38to this section to the state treasurer in accordance with the provisions of
39K.S.A. 75-4215, and amendments thereto. Upon receipt of each such
40remittance, the state treasurer shall deposit the entire amount in the state
41treasury and credit such amount to the public service regulation fund.
42(d) Any facility registration statement and documents submitted to
43the commission in relation thereto shall be a public record and disclosed
1upon request.
2Sec. 7. (a) In addition to the information required to be provided by
3the industrial energy facility owner for an industrial energy facility that is
4permitted or registered pursuant to this act, the commission may require an
5industrial energy facility owner to provide the following information to the
6commission:
7(1) The number and locations within the state of other industrial
8energy facilities that are owned or operated by the industrial energy facility
9owner;
10(2) whether the industrial energy facility owner is currently planning
11to develop or construct any new industrial energy facilities in the state and
12the number and location of such planned facilities;
13(3) the size and dimensions, the energy generation or storage
14capacity, average electric output and anticipated future electric output of
15the industrial energy facility owner's facilities; and
16(4) all names and addresses of the industrial energy facility owners.
17(b) Any such information provided to the commission pursuant to this
18section shall be a public record that is open to public inspection pursuant
19to the open records act. Such information shall be presented to the
20commission in the manner required by the commission. The purpose of
21such information is to allow landowners and policy makers the ability to
22identify the location, dimensions, capacity and the amount of energy
23generated by current industrial energy generation facilities located in the
24state and to provide information on future planning and development.
25Sec. 8. (a) Any new industrial energy facility or expansion of an
26existing industrial energy facility shall meet or exceed the setback
27distances established pursuant to this section.
28(b) For a new industrial wind energy facility or expansion of an
29existing industrial wind energy facility that includes the siting and
30construction of any new wind turbine, no such wind turbine shall be
31located closer than any of the following distances, as measured from the
32ground-level center of the turbine:
33(1) 1.1 times the maximum blade tip height of the turbine to the
34nearest boundary of a public road right-of-way;
35(2) 1.1 times the maximum blade tip height of the turbine to the
36nearest boundary of a nonparticipating property;
37(3) 4.0 times the maximum blade tip height to the nearest point on the
38outside wall of any habitable dwelling, church, school, adult care home,
39medical care facility, child care facility, library, community center, public
40building, office building, confined feeding facility or licensed food service
41or lodging establishment; and
42(4) 5280 feet to the nearest boundary of any state park, state lake,
43wildlife management area or wildlife refuge as defined in K.S.A. 65-171d,
1and amendments thereto.
2(c) For a new industrial solar energy conversion system or expansion
3of an existing industrial solar energy conversion system, no part of the site
4area or footprint of any such system shall be located closer than the
5following distances, as measured from the nearest outside boundary of
6such site area:
7(1) 50 feet from the nearest public road right-of-way;
8(2) 50 feet from the nearest boundary of a nonparticipating property;
9and
10(3) 300 feet from the nearest point on the outside wall of any
11habitable dwelling, church, school, adult care home, medical care facility,
12child care facility, library, community center, public building, office
13building, confined feeding facility or licensed food service or lodging
14establishment.
15(d) For a new industrial battery energy storage system or expansion
16of an existing industrial battery energy storage system, no such part of the
17site area or footprint of such system shall be located closer than the
18following distances, as measured from the nearest outside boundary of
19such site area:
20(1) 50 feet from the nearest public road right-of-way;
21(2) 50 feet from the nearest boundary of a nonparticipating property;
22and
23(3) 300 feet from the nearest point on the outside wall of any
24habitable dwelling, church, school, adult care home, medical care facility,
25child care facility, library, community center, public building, office
26building, confined feeding facility or licensed food service or lodging
27establishment.
28(e) Nothing in this section shall prohibit the establishment, operation
29or enforcement of more restrictive setback distances pursuant to:
30(1) Any planning and land use laws and regulations adopted by a city
31or county pursuant to K.S.A. 12-741 et seq., and amendments thereto;
32(2) an agreement between a county or city and an industrial energy
33facility owner;
34(3) an agreement between a landowner and an industrial energy
35facility owner; or
36(4) an order of the commission in any permit proceeding under
37section 5, and amendments thereto.
38(f) The setback distance requirements established pursuant to this
39section shall not apply with respect to any particular structure listed in this
40section if the industrial energy facility owner obtains a written agreement
41from the owner of any such structure that is within such setback distance
42stating that such owner is aware of the construction or expansion, has no
43objections to such construction or expansion and authorizing the
1construction or expansion within such setback distance. Any such written
2agreement shall be filed in the register of deeds office of the county where
3the structure that such agreement pertains is located.
4Sec. 9. (a) The commission shall establish a code of conduct for the
5development, construction, modification, operation, maintenance and
6decommissioning of industrial energy facilities. The code of conduct shall,
7at a minimum, contain provisions that require each industrial energy
8facility owner to:
9(1) Be truthful and honest in all communications with landowners;
10(2) be transparent about the industrial energy facility project;
11(3) provide appropriate contact information for the industrial energy
12facility owner and any employees, agents, contractors, subcontractors or
13assigns thereof that are associated with the project;
14(4) ensure that all communications with landowners do not contain
15any threat or coercion;
16(5) vacate the property of or cease communications by the request of
17any landowner who requests that the industrial energy facility owner, or
18any employees, agents, contractors, subcontractors or assigns thereof,
19vacate the landowner's property or cease communications with the
20landowner;
21(6) not disclose communications from a landowner unless otherwise
22agreed in writing;
23(7) provide and make accessible project maps to the public during the
24permitting process;
25(8) compensate landowners for any and all damages to land and
26agricultural operations resulting from the development, construction,
27operation or decommissioning of the project and establish procedures to
28determine and calculate compensation for such damages;
29(9) remediate communication circuits that are diminished or disrupted
30due to communication interference caused by the project; and
31(10) indemnify and hold harmless any affected landowner or tenant,
32and any heirs, successors, legal representatives or assigns thereof, from
33any and all liability associated with the development, construction,
34modification, operation, maintenance or decommissioning of the industrial
35energy facility, unless such liability arises from the intentional or willful
36acts of the indemnitee.
37(b) The commission, after consultation with the Kansas department of
38agriculture, shall establish agricultural impact mitigation protocols that
39shall apply with respect to the development, construction, operation,
40maintenance and decommissioning of industrial energy facilities. The
41agricultural impact mitigation protocols shall contain, at a minimum,
42provisions that require each industrial energy facility owner to:
43(1) Provide advance notice to and coordinate with any landowner or
1tenant whenever the industrial energy facility owner needs to access
2private property;
3(2) designate for the industrial energy facility owner one or more
4contacts who have experience in agriculture and may be contacted when
5any agricultural impact mitigation work is not sufficient;
6(3) establish standards for facilities and support structures to
7minimize the impact to agricultural land and operations;
8(4) establish procedures to mitigate and address any impacts to
9important agricultural improvements caused by the project, including, but
10not limited to, impacts to drainage tiles, terraces and irrigation systems and
11lightning and stray voltage mitigation measures;
12(5) establish soil protection measures, including, but not limited to,
13decompaction, fertilization, stabilization, repairs to damaged soil, erosion
14prevention and removal of construction debris;
15(6) establish soil restoration measures that shall apply following
16construction, operational and decommissioning activities, including, but
17not limited to, segregation and replacement of topsoil and reestablishment
18of the vegetative growth that existed prior to disturbance;
19(7) adhere to scientific standards for all agricultural impact mitigation
20work, such as the standards established by the natural resources
21conservation service, the United States department of agriculture farm
22service agency, agricultural extension offices or land grant universities;
23(8) establish procedures for installation and maintenance of any
24necessary gates to the facility or facility structures;
25(9) for any project involving the construction of overhead
26transmission or generation tie lines, construct such lines with an adequate
27line height to ensure that any existing agricultural operations may continue
28under and around such line in a safe manner;
29(10) establish procedures for tree and brush removal, including, but
30not limited to, compensation for removal of trees with commercial value;
31and
32(11) establish procedures for controlling noxious weeds and other
33growth within any lease or easement.
34Sec. 10. (a) Each industrial energy facility owner in this state,
35including any industrial energy facility owner that obtains a permit
36pursuant to section 5, and amendments thereto, or registers with the
37commission pursuant to section 6, and amendments thereto, shall be
38responsible for the full and complete decommissioning or partial
39decommissioning of an industrial energy facility in accordance with this
40section.
41(b) (1) An industrial energy facility owner shall, upon the cessation of
42operations of the industrial energy facility, provide for the full and
43complete decommissioning of the industrial energy facility. The industrial
1energy facility owner shall complete the full and complete
2decommissioning of any such facility not later than one year following the
3date of such cessation of operations.
4(2) An industrial energy facility owner shall, upon the cessation of
5operations of any individual generating unit or energy storage unit of an
6industrial energy facility, provide for the partial decommissioning of the
7industrial energy facility. The industrial energy facility owner shall
8complete the partial decommissioning not later than one year following the
9date of such cessation of operations.
10(c) The commission shall require each such industrial energy facility
11owner to establish and maintain a sufficient, efficient and enforceable
12decommissioning plan for the facility to ensure the full and complete or
13partial decommissioning of the facility upon the cessation of operations of
14the facility or any part thereof. Any such decommissioning plan and
15updates thereto shall be prepared, signed and sealed by a professional
16engineer who is licensed to practice in Kansas. Each industrial energy
17facility owner shall provide to the commission a decommissioning plan
18that contains the following information:
19(1) The name, address and contact information for the industrial
20energy facility owner and the name, address and contact information of
21each landowner that owns property where the industrial energy facility is
22located;
23(2) a narrative that describes the planned sequence for the
24decommissioning and a schedule for the completion of decommissioning;
25(3) a description of whether the decommissioned materials will be
26disposed of, reused or recycled;
27(4) a description of how the disposal of solid or hazardous wastes will
28be permitted and accomplished;
29(5) a description of the materials that may be subject to salvage,
30including the estimated salvage value of such materials;
31(6) a narrative that describes the steps that will be taken to return and
32restore any land disturbed or changed as a result of the construction and
33operation of the facility to the useful condition that existed prior to the
34construction and operation of the facility;
35(7) a cost estimate for the full and complete decommissioning of the
36industrial energy facility in accordance with this section;
37(8) a description of the financial assurance mechanism that the
38industrial energy facility owner shall maintain to comply with the financial
39assurance requirements of this section; and
40(9) any other information determined necessary by the commission.
41(d) The commission shall require and order an industrial energy
42facility owner to establish and maintain financial assurance in a form and
43amount that is sufficient to implement the decommissioning plan for the
1industrial energy facility. The industrial energy facility owner shall provide
2the financial assurance in an amount determined as necessary by the
3commission in the form of an irrevocable standby letter of credit,
4performance bond, surety bond or unconditional payment guarantee
5executed by the parent company of the facility owner. The financial
6assurance shall at all times be accessible by the commission to provide for
7the decommissioning of the industrial energy facility should the owner not
8be financially able to complete the decommissioning.
9(e) The commission shall require each industrial energy facility
10owner to provide to the commission not less than once every five years:
11(1) An updated estimate of the cost to decommission the facility; and
12(2) documentation that the financial assurance maintained by the
13industrial energy facility owner is sufficient to cover such cost.
14(f) Nothing in this section shall prohibit the establishment, operation
15or enforcement of more restrictive decommissioning requirements
16pursuant to:
17(1) Any planning and land use laws and regulations adopted by a city
18or county pursuant to K.S.A. 12-741 et seq., and amendments thereto;
19(2) an agreement between a county or city and an industrial energy
20facility owner;
21(3) an agreement between a landowner and an industrial energy
22facility owner; or
23(4) an order of the commission in any permit proceeding under
24section 5, and amendments thereto.
25Sec. 11. (a) If the commission finds that any industrial energy facility
26owner has violated the provisions of this act, any rules and regulations
27adopted by the commission or any permit or order of the commission, in
28addition to any other penalties imposed by law, the commission may:
29(1) Issue a cease and desist order; or
30(2) impose a civil penalty not to exceed $10,000 per violation. Such
31penalty shall constitute an actual and substantial economic deterrent to the
32violation for which the penalty is assessed. In the case of a continuing
33violation, the commission may deem every day that such violation
34continues as a separate violation.
35(b) No cease and desist order or civil penalty shall be imposed
36pursuant to this section except upon the written order of the commission to
37the industrial energy facility owner who committed the violation. The
38order shall state the violation, the penalty imposed and the right to appeal
39such order to the commission. Any such facility owner, within 30 days
40after service of such order, may make written request to the commission
41for a hearing. The commission shall conduct a hearing in accordance with
42the provisions of the Kansas administrative procedure act within 30 days
43following the receipt of such request.
1(c) The commission may order an industrial energy facility owner to
2pay any costs and reasonable attorney fees incurred by the commission for
3any action brought by the commission pursuant to this section. The
4commission may collect interest on any portion of any penalty, costs and
5attorney fees that remain unpaid for more than 30 days after the
6assessment of the penalty, at the rate provided by K.S.A. 16-204, and
7amendments thereto, for interest on judgments.
8(d) All moneys received by the commission from penalties imposed
9and costs and attorney fees assessed pursuant to this section shall be
10remitted to the state treasurer in accordance with the provisions of K.S.A.
1175-4215, and amendments thereto. Upon receipt of each such remittance,
12the state treasurer shall deposit the entire amount in the state treasury to
13the credit of the public service regulation fund.
14Sec. 12. (a) Any order of the commission established pursuant to this
15act is subject to review in accordance with the Kansas judicial review act.
16(b) No cause of action arising out of any order of the commission
17established pursuant to this act shall accrue in any court to any party,
18unless such party shall have petitioned for reconsideration in accordance
19with the provisions of K.S.A. 77-529, and amendments thereto.
20Sec. 13. The commission may adopt rules and regulations to
21administer and enforce the provisions of this act.
22Sec. 14. This act shall take effect and be in force from and after its
23publication in the statute book.